Download Now
SHUTTLE an 50r Driver

Inspection of the Space Shuttle Spray on Foam. Insulation (SOFI) . Another panel (POD 50R) with six stringers was also investigated. Figure 6. Thread detent adapter into shuttle bore using 3/4” pin tool. (Detent adapter must be flush against base as shown.) torque to 45in-lbs. Shuttle spool assembly. Rent the STEALTH 50R for a great luxury holiday in Ibiza. Smart Charter is the largest boat charter company on the island. Book a yacht online here.


SHUTTLE AN 50R WINDOWS VISTA 32-BIT

Type: Driver
Rating:
4.75
348 (4.75)
Downloads: 669
File Size: 10.19Mb
Supported systems: Windows XP (32/64-bit), Windows Vista, Windows 7, Windows 8.1, Windows 10
Price: Free* [*Free Registration Required]

Download Now
SHUTTLE an 50r Driver

DRIVER FOR SHUTTLE AN 50R

Between these multi-tier racks are provided a transferring shuttle that can run in a horizontal direction. The transferring shuttle is for storing a load to or SHUTTLE an 50r a load from the left or right multi-tier racks.

NEW DRIVERS: SHUTTLE AN 50R

That is, by using the elevator to move the transferring shuttle to another tier, the number of transferring shuttles can be made to be less than the number of SHUTTLE an 50r of the multi-tier racks. The first and second load elevating platforms are able to move upward and downward together with SHUTTLE an 50r shuttle elevating platform while being horizontally in alignment with the shuttle elevating platform.

STEALTH 50R - Ibiza Boats & Yachts Rental

When the shuttle elevating platform is in alignment with the first load elevating platform, a transferring shuttle on the SHUTTLE an 50r elevating platform can deliver a load to or receive a load from the first load elevating platform, and when the shuttle elevating platform is in alignment with the second load elevating platform, a transferring shuttle on the shuttle elevating platform can deliver a load to or receive a load from the second load elevating platform.

The first SHUTTLE an 50r elevating platform and second load elevating platform may be fixed to the shuttle elevating platform in alignment with each other to move upward and downward together with the shuttle elevating platform, or the shuttle elevating platform, first load elevating platform and second load elevating platform may move upward and downward independently from one another.

The load elevating platform may include a conveyor that can convey SHUTTLE an 50r load thereon. If higher throughput performance is needed, a waiting platform to place a SHUTTLE an 50r for waiting may be disposed on at least part of the tiers of the first multi-tier rack and second multi-tier rack, allowing for delivery of the load between this waiting platform and the first load elevating platform and second load elevating platform.

The waiting platform may include a conveyor that can convey a load thereon in order to smoothly deliver a load to or receive a load from the load elevating platforms. SHUTTLE an 50r of providing a conveyor on the waiting platform, the load elevating platform may include a handling mechanism that pushes a load onto the waiting platform or pulls a load from the waiting platform. Each of the shelves may include a frame to fix auxiliary equipment, and the waiting SHUTTLE an 50r may be fixed to this frame.

This allows for easy change from the roaming-type to the captive-type or easy change from the roaming-type to a hybrid-type of the roaming-type and captive-type. Accordingly, by performing handover of a load between the load elevating platform and the shuttle elevating platform while SHUTTLE an 50r transferring shuttle is moving upward and downward, the transferring shuttle does not need to have a load wait thereon.

SHUTTLE an 50r and other objects, advantages and features of this invention will become apparent upon review of the following specification in conjunction with the drawings. In the drawings, identical or corresponding parts have the same reference numbers. Each of the multi-tier racks 14L, 14R has shelves 16 extending in the same horizontal direction front-back direction SHUTTLE an 50r FIG.

The pair of multi-tier racks 14L, 14R are arranged parallel to each other in a predetermined SHUTTLE an 50r apart from each other. The left multi-tier rack 14L corresponds to the first multi-tier rack in the claims, and the right multi-tier rack 14R corresponds to the second multi-tier rack in the claims. Between these multi-tier racks 14L, 14R are disposed guide rails not illustratedat each SHUTTLE an 50r, parallel to each other in the direction in which the shelves 16 extend; and the transferring shuttles 10 can run along these guide rails.

8 assembly – Trebor 50R Maxim User Manual

The transferring shuttle 10 is for storing a load P onto and retrieving a load P from the left and right multi-tier racks 14L, 14R, and can be a conventional-type transferring shuttle. That is, the transferring shuttle 10 not specifically illustrated in detail is composed of a travelling cart 18 that can place a load P on the center portion thereof, and a handling mechanism 20 that is provided in the travelling cart 18 and is for pushing the placed load P rightward or leftward and pulling SHUTTLE an 50r load P from outside of the travelling cart This handling mechanism 20 includes a pair of arms 22 that extend both leftward SHUTTLE an 50r rightward in a horizontal direction left-right direction in FIG.

By extending the arm 22 either leftward or rightward SHUTTLE an 50r the fingers 24 closed, the load P placed on the center portion of the transferring shuttle 10 can be pushed out, enabling the load P to be stored onto a shelf 16 that is on the same height level as that of the surface of the center portion of the travelling cart 18 in the transferring shuttle By extending the arm 22 onto the shelf 16 with the fingers 24 open, SHUTTLE an 50r the load P with the fingers 24 SHUTTLE an 50r retracting the arm 22 with the fingers 24 closed, the load P can be collected onto the transferring shuttle A transferring shuttle 10 is moved, between tiers, by the elevator 12 disposed to one end of the left and right multi-tier racks 14L, 14R.

The elevator 12 is composed of masts 26 disposed at an SHUTTLE an 50r adjacent to the space between the left and right multi-tier racks 14L, 14R; a shuttle elevating platform 28 that can move upward and downward between these masts 26; and a drive motor not illustrated for shuttle elevating platform The shuttle elevating platform 28 includes guide rails that can connect to the guide rail of each tier.

Accordingly, by moving the shuttle elevating platform 28 up or down to dispose at a height of a desired tier, the transferring shuttle 10 at the tier can be pulled onto the shuttle elevating platform SHUTTLE an 50r Then, by moving the shuttle elevating platform 28 with the transferring shuttle 10 placed thereon to another tier, the transferring shuttle 10 can be put onto a guide rail in the tier.

This enables the SHUTTLE an 50r shuttle 10 to be retrieved from the system without a special crane or the like so that the maintenance work for the shuttle 10 can be performed outside the system. In SHUTTLE an 50r present embodiment, these load elevating platforms 30L, 30R are coupled to the shuttle elevating platform 28 in a horizontal alignment with each other, and travels, that is, moves upward and downward together with the shuttle elevating platform These load elevating platforms 30L, 30R can deliver a load P onto and receive the load P from the transferring shuttle 10 on the shuttle elevating platform The left load elevating platform 30L corresponds to a first load elevating platform and the right load elevating platform 30R corresponds to a second load elevating platform.

Related Posts